(360) 593-0931Serving Woodland & SW Washington  •  WA Lic# HILLMEL756R4

RESIDENTIAL EPOXY • WOODLAND, WA

Polyaspartic Coatings in Woodland, WA

The premium topcoat that makes a floor UV-stable, hot-tire-proof, and ready to handle the toughest use.

OVERVIEW

The Toughest Finish We Offer

Polyaspartic is a high-performance coating we apply over an epoxy base as the protective topcoat. It is prized for being UV-stable (it won't yellow in sunlight), extremely abrasion- and chemical-resistant, and able to cure in a wide range of temperatures — a real advantage in the Northwest.

Most floors use an epoxy/flake base sealed with a polyaspartic topcoat for the best of both worlds: a thick, hard build plus a tough, long-lasting finish. Installs typically take about 2–3 days.

WHY YOU'LL LOVE IT

Why Add a Polyaspartic Topcoat

UV-Stable, No Yellowing

Unlike bare epoxy, polyaspartic holds its color even in direct sunlight.

Hot-Tire-Proof

Resists the hot-tire pickup that can ruin lesser coatings.

Abrasion & Scratch Resistant

Stands up to heavy traffic, tools, and equipment.

Cures in Cooler Temps

Performs well in the Northwest climate, even when it's cool out.

Chemical Resistant

Shrugs off oil, salt, and common household and shop chemicals.

Long-Lasting Shine

Keeps its gloss and protection for many years.

PERFECT FOR

When to Choose Polyaspartic

High-Use Garages

Maximum protection for floors that see daily abuse.

Commercial & Shops

Durability for heavy traffic and equipment.

Sunlit Spaces

UV stability keeps the finish from yellowing near windows and doors.

QUESTIONS

Frequently Asked Questions

What is the difference between epoxy and polyaspartic?

Epoxy builds a thick, hard base layer; polyaspartic is a tougher, UV-stable topcoat. Most of our floors use both — an epoxy/flake base sealed with a polyaspartic topcoat.

Can you install in cold or wet weather?

Yes. Polyaspartic cures across a wide temperature range, and we control the work area so coatings cure properly year-round in the Northwest.

How long until I can use the floor?

Most installs take about 2–3 days. You can walk on it around 24 hours after the final coat, and drive on it once it has fully cured — about a week.

Want the Most Durable Floor Possible?

Free, no-pressure quotes for Woodland and all of Southwest Washington.